

Royal Automobile Club





Project Description
Bespoke Lift Replacement for a Prestigious Residential Development.
At 59 Cadogan Gardens, Arrow Lift Engineers delivered a complete passenger lift replacement, combining modern technology with bespoke design to complement the character of this prestigious residential property. The project involved replacing the existing bottom-drive traction lift with a new energy-efficient, eight-person machine-room-less (MRL) traction lift, serving seven floors from ground to sixth.
An important element of the project was extending the existing lift shaft from the fifth to the sixth floor, providing lift access to the penthouse apartments. Working within the constraints of the building's existing steel structure required careful planning and a tailored engineering approach to accommodate the new installation.
Arrow delivered a complete lift replacement, incorporating modern, energy-efficient equipment while adapting the installation to the building's structural requirements. Particular attention was given to the finished appearance, with bespoke landing architraves and a lift car interior designed to the client's specification, ensuring the new installation complemented its surroundings.
Completed in December 2025, the project delivered a modern, energy-efficient lift installation with extended access to the penthouse level. The result demonstrated Arrow's ability to combine complex engineering solutions with high-quality finishes, delivering installations tailored to both the building and the client's requirements.
1.0m/s
SPEED
Private Residential
PROJECT TYPE
1
LIFT

