top of page
ARROWLIFTS_Images-32.JPG

Arlington Court

ARROWLIFTS_Images-17.JPG
ARROWLIFTS_Images-39.JPG
ARROWLIFTS_Images-07.JPG
ARROWLIFTS_Images-37.JPG
ARROWLIFTS_Images-08.JPG

Project Description 

Bringing a Residential Lift Back into Service After Two Years. 

 

At Arlington Court, Arrow Lift Engineers undertook a comprehensive lift modernisation to restore a vital service to residents after the existing passenger lift had been out of operation for two years.  The project required a carefully considered engineering solution to introduce modern equipment and automatic doors within the restricted dimensions of the existing lift shaft.

 

The existing four-person passenger lift was fitted with traditional mid-bar gates at the landings and within the lift car.  Modernising the installation presented particular challenges due to the limited space available within the shaft, requiring a tailored approach to accommodate a new automatic door system without a complete replacement of the lift.

 

Arrow replaced the original mid-bar gates with four-speed, centre-opening automatic doors, carefully designed to fit within the available space.  The modernisation also included a new energy-efficient hoisting machine and control panel, together with the incorporation of A3 protection against unintended lift car movement.  These upgrades brought modern operating technology and enhanced safety features to the existing installation.

 

Completed in September 2026, the modernisation successfully returned the lift to service, providing residents with a modernised passenger lift incorporating automatic doors, upgraded controls and improved safety features.  The project demonstrated how a carefully planned modernisation could transform an ageing lift, even where space and existing building constraints presented significant engineering challenges.

0.5m/s

SPEED

Private Residential

PROJECT TYPE 

1

LIFT

Arrow Lifts
  • Linkedin

© 2025 by Arrow Lift Engineers. All rights reserved.

bottom of page